Over the last few days, Ric and Samir have been on site at the University of New England’s SMART Farm to install the recently developed MCC Hub network.

The technology involved in the project is an extension of the MCC platform, with an extra RF module added to 8 of the Hubs, and a GSM module added to 1 of the Hubs.

The extra RF allows the coverage at site to be extended, so that instruments can connect to the same network from anywhere on the farm.

MCC Hub installed at UNE SMART Farm
MCC Hub installed at UNE SMART Farm

The GSM component brings the whole site online. This allows remote configuration, troubleshooting and maintenance of the site via the EnviroNode software, which was performed from the office in Sydney.

The installation went smoothly for the first three days, however the last day some rain did make things difficult, as you can see below!

Samir Aganovic (Dosec Design) configures a Hub in the rain at UNE SMART Farm.
A Hub is configured in the rain at UNE SMART Farm.

The commissioning of the MCC Hub network at the site will take place in November.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s