1996 Port Dickson – Open Highway
  • Design and manufacture of 22 dedicated emergency telephones, central exchange equipment and 1 operator console. Commissioning of all equipment on site.
1996 Karak – Open Highway
  • Design and manufacture of 50 dedicated emergency telephones, central exchange equipment and operator consoles. Commissioning of all equipment on site.
1996 Gamuda – Open Highway
  • Design and manufacture of 40 dedicated emergency telephones, central exchange equipment and operator consoles. Commissioning of all equipment on site.
1996 United Engineers – Open Highway
  • Design and manufacture of 40 dedicated emergency telephones, central exchange equipment and 2 operator consoles. Commissioning of all equipment on site.
1999 – 2000 Ampang – Kuala Lumpur Elevated Open Highway
  • Design and manufacture of 34 dedicated emergency telephones, central exchange equipment and 1 operator console. Commissioning of all equipment on site.
  • Fibre Optics Backbone to 5 nodes.
  • Copper cabled between nodes.
  • Short pillar telephone housing.

akleh

2000 – 2002 Shapadu – Open Highway
  • Design and manufacture of 17 dedicated emergency telephones, central exchange equipment and operator consoles. Commissioning of all equipment on site.
  • Long pillar telephone housing.
2003 – 2004 Kesas – Open Highway
  • GSM Mobile Network/Solar Phones on an Open Highway.
  • Design and manufacture of 46 GSM emergency telephones, central exchange equipment and 1 operator console.
  • Commissioning of all equipment on site.