1996 Port Dickson – Open Highway |
- Design and manufacture of 22 dedicated emergency telephones, central exchange equipment and 1 operator console. Commissioning of all equipment on site.
|
1996 Karak – Open Highway |
- Design and manufacture of 50 dedicated emergency telephones, central exchange equipment and operator consoles. Commissioning of all equipment on site.
|
1996 Gamuda – Open Highway |
- Design and manufacture of 40 dedicated emergency telephones, central exchange equipment and operator consoles. Commissioning of all equipment on site.
|
1996 United Engineers – Open Highway |
- Design and manufacture of 40 dedicated emergency telephones, central exchange equipment and 2 operator consoles. Commissioning of all equipment on site.
|
1999 – 2000 Ampang – Kuala Lumpur Elevated Open Highway |
- Design and manufacture of 34 dedicated emergency telephones, central exchange equipment and 1 operator console. Commissioning of all equipment on site.
- Fibre Optics Backbone to 5 nodes.
- Copper cabled between nodes.
- Short pillar telephone housing.
|